The Bali Observer

Friday, 27 November 2026

Turyapada Tower Gondola Work Reaches 55 Percent in Buleleng

Gondola facility construction at Buleleng’s Turyapada Tower reached 55 percent on Nov. 17. Equipment was shipping from Surabaya, with arrival targeted by late November and installation in early December.

By

Editor: Mursyid Sonsang

· 2 min read

Open the larger photo. Illustration: A red cable car cabin hangs from wires against a pale blue cloudy sky.
Illustration: A red cable car cabin hangs from wires against a pale blue cloudy sky. · Photo: Ondosan Sinaga / Pexels

Buleleng — Equipment for the gondola at the Turyapada Tower KBS 6.0 tourism complex was being shipped from Surabaya on Nov. 17, 2026, as construction of the facility reached 55 percent. The Bali provincial government said the equipment was expected to arrive in Bali by the end of November, allowing installation to begin in early December.

The update was given by Gede Pramana, head of the Bali Provincial Communication, Informatics and Statistics Agency, as work continued on the gondola facility in Buleleng Regency. The equipment’s arrival is the next stage in a project that has already moved into construction of the gondola facilities.

Why the 55 Percent Progress Matters for Visitors

For visitors, the gondola is intended to become part of the Turyapada Tower tourism complex in northern Bali. The 55 percent figure refers to construction progress on the gondola facility, not the completion of the entire tourism complex. Installation depends on the equipment reaching Bali and the construction work proceeding as planned.

The Bali provincial government expects the equipment to arrive by the end of November 2026. The planned installation window is early December, making the shipment from Surabaya the immediate operational milestone. The project’s construction period is scheduled to run through the end of February 2027, although the provincial government hopes the work can finish sooner.

Turyapada Tower KBS 6.0 is a tourism and broadcasting development in Buleleng. Earlier reporting said the tower’s main structure had been completed while supporting facilities, including the gondola terminal and related tourism amenities, remained under development. The latest progress update concerns the gondola facility specifically.

The next stated step is the arrival of the main equipment in Bali by the end of November, followed by the targeted start of gondola construction installation in early December.

Sources

Read next

  1. More on this story

  2. Most read in Tourism & Hospitality

  3. Today’s top story

Related

‹ Back to the home page

Share this story

Share as an image

For an Instagram Story, a WhatsApp Status or TikTok. The story link is copied too, ready to paste into the Link sticker.

Preview of the Story / Status card for this story
Story / Status · 9:16
Save image
Preview of the Feed card for this story
Feed · 4:5
Save image

Reading tools

Normal

A sample of the body text size. Your choice is kept on this device.