The Bali Observer

Saturday, 21 November 2026

West Lombok Residents Protest Kebon Kongok Landfill Over Leachate Risk

Residents protested leachate disposal at West Lombok’s Kebon Kongok landfill. A regional legislator proposed a 100–150-ton-per-day incinerator as waste volumes reached 350–450 tons daily.

By

Editor: Mursyid Sonsang

· 2 min read

Open the larger photo. Illustration: A vast mound of garbage stretches to the horizon under a setting sun with tiny distant scavengers.
Illustration: A vast mound of garbage stretches to the horizon under a setting sun with tiny distant scavengers. · Photo: Tom Fisk / Pexels

Lombok Barat — Residents protested at the Kebon Kongok Regional Final Processing Site in Suka Makmur Village, Gerung District, on Nov. 17, objecting to the expansion of leachate disposal. The landfill receives 350 to 450 tons of waste each day from Mataram and West Lombok, according to reports.

The dispute centers on the landfill’s capacity and the management of leachate, the liquid produced as waste decomposes and water passes through accumulated refuse. Residents fear the liquid could contaminate wells serving nearby communities.

Why it matters: leachate risks nearby wells

Suharto, a member of the West Lombok–North Lombok electoral district in the West Nusa Tenggara Regional House of Representatives, said conventional waste handling was no longer sufficient at Kebon Kongok. He proposed an incinerator capable of processing 100–150 tons per day.

Reports said Suharto also urged the provincial government to improve the landfill’s leachate storage and wastewater treatment systems, including the use of an aerator before treated water is discharged into the environment. He warned that uncontrolled leachate could threaten residents’ wells.

The landfill serves Mataram and West Lombok, linking a regional waste-management problem to the daily water security of communities near the site. For residents and visitors in the area, the practical issue is not only the volume of waste arriving at Kebon Kongok but whether leachate is contained and treated before it reaches soil or groundwater.

Another report said the landfill has faced recurring conflict over capacity, expansion and alleged well contamination. It reported that the site had at times restricted incoming waste while authorities considered further measures. The reports do not state a completed timetable for the proposed incinerator.

Sources

Read next

  1. More on this story

  2. Most read in Environment

Related

‹ Back to the home page

Share this story

Share as an image

For an Instagram Story, a WhatsApp Status or TikTok. The story link is copied too, ready to paste into the Link sticker.

Preview of the Story / Status card for this story
Story / Status · 9:16
Save image
Preview of the Feed card for this story
Feed · 4:5
Save image

Reading tools

Normal

A sample of the body text size. Your choice is kept on this device.