The Bali Observer

Saturday, 21 November 2026

Lombok Sets Early 2027 Start for Senggigi Market Revitalisation

Senggigi Art Market in West Lombok is scheduled for physical revitalisation in early 2027, with Rp84.5 billion (about US$5.3 million) from the Ministry of Public Works. The plan combines tourism, culture and local enterprise.

By

Editor: Mursyid Sonsang

· 2 min read

Open the larger photo. Archive photo: Streets of Lombok Island.
Archive photo: Streets of Lombok Island. · Photo: Jeromi Mikhael / Wikimedia Commons, CC BY-SA 4.0

Lombok — The revitalisation of Senggigi Art Market in West Lombok is scheduled to begin in early 2027, backed by Rp84.5 billion (about US$5.3 million) from the Ministry of Public Works, according to reports published on Friday, Nov. 20, 2026.

The project is intended to reshape the market as a mixed-use public space combining tourism, local-product trading, food, arts and cultural performances, and facilities for micro, small and medium enterprises. Physical construction has not yet begun because West Nusa Tenggara is completing the project’s Readiness Criteria documents.

Why the Senggigi project matters to Lombok visitors

For foreign visitors, the plan points to a future change in how Senggigi’s cultural and commercial spaces are presented. The market is being planned not simply as a building refurbishment, but as a destination that brings together tourism activity, local products, food and cultural performances. The reports do not state that existing visitor access has been closed or that construction has started.

The Ministry of Public Works is the central-government agency providing the reported funding. Ahmad Nur Aulia, head of the West Nusa Tenggara Tourism and Creative Economy Office, said the regional government was still completing the required documents. Once those documents are complete, the province is expected to proceed with tendering and contract signing.

The project was discussed alongside wider cultural revitalisation in West Nusa Tenggara. On Nov. 18, 2026, Culture Minister Fadli Zon reviewed revitalisation work involving the NTB State Museum and the NTB Cultural Park. The reports describe the Senggigi market as a separate revitalisation project linked to tourism, arts, culture and local enterprise.

What happens next

The readiness documents are targeted for completion in December 2026. Tendering, contract procedures and the start of physical work are planned for 2027, with construction targeted for early in the year. The planned combination of tourism, culture, local products, food, performances and facilities for micro, small and medium enterprises is intended to give the market a broader public and economic role. The project remains at the documentation stage until the required readiness materials are completed.

Sources

Read next

  1. Most read in Culture & Ceremony

Related

‹ Back to the home page

Share this story

Share as an image

For an Instagram Story, a WhatsApp Status or TikTok. The story link is copied too, ready to paste into the Link sticker.

Preview of the Story / Status card for this story
Story / Status · 9:16
Save image
Preview of the Feed card for this story
Feed · 4:5
Save image

Reading tools

Normal

A sample of the body text size. Your choice is kept on this device.